Danby Projects recently completed the civil works to the new Seqirus Vaccines Fill and Finish facility in Liverpool. This is the new £40M facility to further enhance Seqirus in Liverpool as the largest influenza vaccine manufacturing facility in the UK and one of the largest in Europe.

Danby Projects completed this work adjacent to existing production areas, with real emphasis on not disrupting the clients ongoing operations. Close liaison throughout the project, with the client and design team ensured on time hand over.

PROJECT HIGHLIGHTS

  •  Break out and crush on site, existing 1800m2 of concrete floor though out the new facility
  • Internal drainage modifications
  • Design and install a new 1800m2 FM2 tolerance concrete power floated floor throughout.
  • Install new structural steel work and subsequent reinforced concrete, bunded, mezzanine floor structures
  • Structural modifications to accommodate new lift shaft and precision weigh scales