We were instructed to carry out the concrete repairs and protective screeding to the existing RC Plinth at Eon Power in Northwich, Cheshire. This was part of the installation of a new, more efficient and technologically advanced Steam turbine at the Cheshire CHP Power Station.
The project was completed on time and handed over to the client in very demanding conditions.
PROJECT HIGHLIGHTS
- Removal of existing degraded concrete and finishes
Preparation of existing surface
Concrete repairs with high performance Epoxy Mortar
High performance Epoxy Screed to whole Turbine Plinth